Notes:
If parcel is located in a subdivision approved for septic systems, check
the subdivision data for individual lot requirements. If subdivision has
septic system design on file, no test drill is necessary.
Any lot less than 1.5 acres
needs an approved septic system design prior to building permit
approval.
Test Drill
Map Legend
No Test Drill
Required
40 Foot Deep Leaching
Pits Required
Perc Test
& System Design Required
Test Drill & System
Design Required
Dual leaching field system installation required on lots of 1.0 acre or
less. Lots with public water require dual systems on 1/2 (.5) acre or
less.
For questions or more information, please contact: Sacramento County Environmental
Management Department
Water Protection Division
8475 Jackson Road, Suite 240
Sacramento, CA 95826-3904
916-875-8400
916-875-7649 (fax) emdinfo@saccounty.net